+--------------------------------------------------------------------------+ | KNORR CRUISE SYNOPSIS | +--------------------------------------------------------------------------+ Voyage - Leg: KN 195-04 Voyage Dates: 4 - 23 March 2009 Chief Scientist(s): Jim Johnson (Lein) Address: University of Washington / APL 1013 NE 40th street Seattle, Wa. 98105 Phone: 206 685-9563 Email: jimj @apl.washington.edu Cruise Objective: Recovery of 1 Surface mooring ** The CTD plan is to do yo-yo casts to 400m 3 times up/down when we arrive and then again just before recovery.* No water samples needed. (BD 2/6) Science Activities: Operations Area: Equator 0 deg 05 N 139 deg 59 W 4300 m Departure Port: Honolulu, Hawaii Agent: All packages / spare parts / mail , etc should be sent to the ship as follows: Master r/v KNORR C/O University of Hawaii Marine Center # 1 SAND ISLAND ACCESS ROAD HONOLULU , HAWAII 96819 Contact: Mr. Keith Adams Purchasing Agent at University of Hawaii Phone: (808) 842 9811 Fax: Email: [1]keitha@soest.hawaii.edu Arrival Port: Galapagos Agent: Primary Agent: Vasile Tudoran Transport 819 Ohio Ave. Long Beach, CA 90804 Contact: Vasile Tudoran Phone: (562) 882-5590 Fax: (562) 434-9800 Email : [2]vtudoran@aol.com Subagent: Master R/V Ship Name Attn: Scientist's Name IN TRANSIT PUERTO AYORA, GALAPAGOS c/o Naugala Yacht Services Bario El Eden Puerto Ayora, Isla Santa Cruz, Galapagos ECUADOR Contact: Johnny Romero Phone: 011 593 525 27403 Cell: 011 593 99 339494 Email: [3]nautigal@interactive.net.ec Note: Agent and WHOI contacts should be copied on all communications. It is requested that shipment information of any equipment be communicated to the Agent and WHOI contacts SHIP Installed or Normally 3.5 kHz bathymetry system Carried Equipment: CTD/rosette system (1-2 yo yo casts before and after recovery 400m (EC 1/19)) ADCP 75 & 150 (EC 1/19) WHOI-Provided Equipment: Rigging shope and SSSG are sending to HI: (EC 1/19) TSE winch with rigging block (need power hookup for winch (EC 1/19)) spare deck box 8011 bull rope, deck/rigging box, canvas wraps 220 3 phase power and a connector required for spooler sci party will bring extra cable for deck connection (EC 1/19) Science Party-Provided 8 empty spools for wire and nylon rope. Equipment: Need 220V for spooler Notes: We would like to have one of the WHOI mooring winches to spool up 3700m. of 3/4" nylon mooring line. We also have 500m. of 1/2" jacketed wire rope that we would like to spool up on the ships trawl winch. We will need to pass 5/8" hardware as we spool up the 500m. piece. They will spool the line onto the TSE winch. They will need to spool the first 500m section on and then unspool this onto a reel before spooling the remaining line onto the TSE (EC 1/19) After the mooring is recovered, we will transfer the 500m. line to our own wood spool. They will bring thier own spooler to do this (EC 1/19) We will check with USDA to bring wood spools back into US before loading spools in HI. JASON Installed or Normally Carried Equipment: Science Party-Provided Equipment: Notes: Load in HI: spooler (220V), empty reels, basket, power washer, TSE winch, deck box, rigging equipt. Other Notes: $100 per person entry fee to Galapgos SSSG Tech: Check List: Required? Comments US Customs Form No Costa Rica Diplomatic Clearance No Isotope Use Approval No SCUBA Diving No Last Modified: 02/06/2009 References Visible links 1. mailto:keitha@soest.hawaii.edu 2. mailto:vtudoran@aol.com 3. mailto:nautigal@interactive.net.ec