+--------------------------------------------------------------------------+ | OCEANUS CRUISE SYNOPSIS | +--------------------------------------------------------------------------+ Voyage - Leg: OC 439 Voyage Dates: 28 Sept - 03 Oct, 2007 Chief Scientist(s): Robert Weller (Weller) Address: Woods Hole Oceanographic Institution Clark 204A MS 29 Woods Hole, MA 02543 Phone: 508-289-2508 Email: rweller @whoi.edu Cruise Objective: Our primary tasks are: 1) recover the bottom section of the CLIMODE surface mooring in the vicinity of the Gulf Stream at 38.5*N, 65*W and 2) recover a surface mooring near the Martha's Vineyard Coastal Observatory.* We will do the CLIMODE recovery first. Science Activities: Mooring Recovery Operations Area: Woods Hole to Gulf Stream station 1- MVCO 41*17N 70* 36'W; Station 2 38* 25'N 64* 47'W 0-5000 m Departure Port: Woods Hole, MA Agent: Master R/V Ship Name Attn: Scientist's Name c/o WHOI 266 Woods Hole Rd. Woods Hole, MA 02543 Contact: John Dyke Phone: (508) 289-3770 Fax: (508) 457-2185 Email: [1]jdyke@whoi.edu Arrival Port: Woods Hole, MA Agent: Same as above SHIP Installed or Normally 12 kHz Bathymetry Carried Equipment: ADCP Pinger for wire use GPS Navigation WHOI-Provided Equipment: Science Party-Provided Mooring winch, block for A-frame, tuggers for Equipment: surface mooring deployment at MVCO, for recovery of bottom of CLIMODE surface mooring (top part recovered earlier by Knorr) Notes: Night Work Anticipated Other Notes: Our primary tasks are: 1) recover the bottom section of the CLIMODE surface mooring in the vicinity of the Gulf Stream at 38.5*N, 65*W and 2) recover a surface mooring near the Martha's Vineyard Coastal Observatory.* We will do the CLIMODE recovery first. The schedule is: Sept 28, 2007*** ******* 1015 local***** ******* Depart WHOI**** ******* ******* ******* ******* Transit @ 10kts to F*** ******* 331.7 nm ******* ******* Mooring F (38* 19.1'N, 64* 47.0'W) Sept 29, 2007 ******* 1700*** ******* Arrive F (surface mooring)***** ******* ******* ******* ******* 3 point anchor survey, ADCP check of surface currents ** ******* practice maneuvering ship Sept 30, 2007* ******* ******* ******* Strategy to be developed based on conditions.* Possibly, wait for ****** ******* daylight and fire acoustic release, start recovery of F starting ~0800* Oct 1, 2007**** ******* ******* Finish recovery operations***** ******* 2300*** ******* Underway to surface buoy off MVCO* ***** ******* Surface buoy ~ (41* 20.195'N, 70* 33.3865'W) *** ******* F to MVCO = 322 nm; Transit @ 10 kts; 32 hours Oct 2, 2006****** ******* ******* ******* ******* underway to MVCO Oct 3, 2007**** 0800*** ******* recover surface mooring off MVCO 1400*** ******* arrive WHOI SSSG Tech: Check List: Required? Comments US Customs Form No Diplomatic Clearance No Isotope Use Approval No SCUBA Diving No Last Modified: 09/12/2007 References Visible links 1. mailto:jdyke@whoi.edu