+--------------------------------------------------------------------------+ | KNORR CRUISE SYNOPSIS | +--------------------------------------------------------------------------+ Voyage - Leg: KN 187-2 Voyage Dates: 01-22 October, 2006 Chief Sci(s): Craig Lee (Lee) Address: Applied Physics Laboratory, University of Washington 1013 NE 40th St Seattle, WA 98105-6698 Phone: (206) 685-7656 Email: craig @apl.washington.edu Cruise Objective: Recover Davis Strait moored array Service moored instrumentation Redeploy moored array Deploy gliders Occupy hydrographic sections Science Activities: EC 9/13: Recover moorings: 6 sub surface, 8 bottom, 2 other. Service and redeploy moorings: 6 sub surface, 8 bottom, 3 other. ROV ops for recovery of failed moorings using the Phantom ROV from MBARI run 4 hydrographic lines and 4 if time permits. Glider deployments Operations Area: Davis Strait, S. Baffin Bay, N. Labrador Sea between 63 and 70 N 50 - 2000 m SSSG Tech: sssg @knorr.whoi.edu Robbie Laird Amy Simoneau Departure Port: Nuuk, Greenland Agent: Master R/V Knorr Attn: Name c/o Royal Arctic Liner Agency Aqqusinersauq 52, PO Box 1629 3900 Nuuk GREENLAND Contact: Freddy Laursen, Gorm Diernisse tel. 299 349281, 299 349280 fax: 299 349289 cell: 299 555649, 299 555650 email: portagent@ral.gl, god@ral.gl Arrival Port: Nuuk, Greenland Agent: Same as above Installed Scientific ADCP (EC 9/13): 75 kHz only, 150 and/or 300 will be Equipment: taken out for science provided Trackpoint transducer) Deionized Water CTD 24X10L - T, C, dissolved oxygen (EC 9/13): transmissometer and fluorometer IMET - Wind, LW,SW, RH,AT,BP - Freshly Calibrated Seabeam Doppler/GPS Nav EC 9/13: fridge and freezer space for nutrient sample storage WHOI-Provided Science Mooring Winch Tools: Program-Provided Storage Container Science Tools: Phantom ROV from MBARI Trackpoint transducer Shipboard Possible small boat ops for glider recovery Equipment/Nav: Other Requirements: EC 9/13: Andy B. is working on Trackpoint transducer installation. Lee's 20' container will on main deck, port side aft. 10' container will stay at WHOI. Trawl winch may be needed for mooring recovery. Lee will bring dragging gear. All gear will remain on Knorr until Knorr returns to WHOI on Nov 1. Gear will be off-loaded on Nov 2-3. Haz Mat: Lithium batteries in pressure cases. 1 Chem. Night Work Anticipated Notes: Navy Clearance Status: Last Modified: 12/14/2006 Check List: Required? Comments US Customs Form Yes For items returning to US Explosives Clearance No Isotope Use Approval No Diplomatic Clearance Yes Greenland/Denmark, Canada SCUBA Diving No